Material prices move between the bid and the build
You bid the job in March and shingle prices rose 9% before the crew loaded the truck — so a job priced at 32% margin builds at 24%, and the supplement never gets filed. Fynso tracks material cost as a percentage of each job against the original bid and flags the spread before it quietly eats the project.